Every workflow between your MRP and your floor
We either pull directly from the systems you already run, or build an adjacent system where the MRP doesn't fit how the floor works. Every scenario below is labeled honestly: 19 in production today and 26 we can build.
Pull from what you have, or build beside it
Pull From Existing Systems
When your MRP, accounting, or payroll already holds the right data, we read and write to it directly. The custom app becomes the interface the floor actually uses.
Adjacent System
When the MRP model doesn't fit how the floor works, we build a purpose-built system beside it. It tracks everything in between and only sends reconciled results back.
Fab Batch Sub-Scheduler with Hand Counts
Fab prepares material in batches, but the MRP expects individual work orders. Instead of planners creating a large number of MRP work orders just to run batch prep, we built a sub-scheduler beside the MRP that groups the work, captures hand counts, and tracks everything in between.
MRP Demand
Parent job and demand stay in the MRP.
Batch Prep Queues
The sub-scheduler groups Fab work into batches—no pile of individual MRP work orders.
Built-in Hand Counts
Operators record counts directly in the batch.
Tracked In Between
Every quantity is tracked between the MRP and the floor.
Reconciled Back
Completions return to the MRP already reconciled.
Ticket traveler cards that know if the parts are ready
Each traveler card shows whether required inventory—like painted parts or shelf parts—is available before work starts. No more "is it ready?" trips to stock.
- Holds placed and released right on the ticket
- Handoffs between stations and shifts recorded with context
- Start, stop, and elapsed time tracked per ticket
Ticket · Assembly Station
UI illustration of the pattern — not client data.
Station ticket
[Operator] needs labels
Leader sees the exact request and responds.
UI illustration of the pattern — not client data.
Floor-to-leader alerts without leaving the station
When a floor employee needs something from a leader, they tap Alert on their ticket. Programmed alert badges go off and show exactly what the request is—so the operator keeps working instead of walking the floor to find help.
Executive & shipping dashboards from data the floor already records
Because tickets, inspections, holds, inventory, and alerts all live in one system, leadership gets a live operating picture without anyone building a spreadsheet.
- Shipping: what's due, shipped, and late
- WIP and job status by department
- Quality: holds, inspections, and scrap
- Inventory and parts availability
- Alert and response activity
Plant Operations Dashboard
UI illustration of the pattern — not client data.
Turret Press · Camera Monitor
Run vs. idle time per machine
UI illustration of the pattern — not client data.
Machine utilization from a camera you already own
Retrofitting sensors on older equipment is expensive. Instead, an existing CCTV camera watches a turret press, detects when it's moving or idle, and builds a time utilization report.
- No sensors, wiring, or PLC changes on the machine
- Run vs. idle detection from the video feed
- Time utilization report per machine
- A path to downtime reason codes and OEE
Filter by department, integration mode, and status
Showing 45 of 45 workflows
Fab Batch Sub-Scheduler with Hand Counts
Problem: Fab prepares material in batches, but the MRP expects individual work orders—forcing planners to create a large number of MRP work orders just to run batch prep.
How it works: A dedicated sub-scheduler groups demand into batch prep queues with built-in operator hand counts, and tracks every quantity between the MRP and the floor.
Returns: Reconciled batch completions and counts returned to the MRP
Work Order Dispatch & Floor Queues
Problem: Operators rely on printed travelers and supervisors to know what to run next.
How it works: Open jobs are pulled from the MRP into live, custom-branded queues by work center, line, or shift.
Returns: Job status and completions synced back to the MRP
Ticket Handoffs Between Stations and Shifts
Problem: Work stalls or gets lost when jobs move between stations, departments, or shifts.
How it works: Each ticket records who handed it off, where it went, and when—so the next station picks it up with full context.
Returns: Handoff history attached to the ticket record
Ticket Time Tracking
Problem: Nobody knows how long jobs actually take at each step without manual logs.
How it works: Start, stop, and elapsed time are captured on every ticket as work happens.
Returns: Actual time per ticket and step available for review
Floor-to-Leader Alert System with Programmed Alert Badges
Problem: Operators leave their station to find a leader when they need labels, material, or help.
How it works: The operator taps Alert on their ticket, and programmed alert badges go off showing exactly what is needed—e.g. "[Operator] needs labels".
Returns: Alert requests tied to the originating ticket
PILs (In-Process Inspection Lists)
Problem: Inspection sheets live on paper or Excel with inconsistent revisions.
How it works: Digital checkpoints are bound to active jobs with gated sign-offs and defect capture.
Returns: Traceable inspection history by job, operator, and time
RILs (Receiving Inspection Lists)
Problem: Dock receipts are reconciled by hand between purchasing, QA, and accounting.
How it works: Receiving checklists are matched to MRP purchase order lines with lot and cert capture.
Returns: Released receipts and inspection results synced back
Holds on Tickets and Material
Problem: Suspect parts or jobs keep moving because holds are verbal or on sticky notes.
How it works: Holds are placed and released directly on tickets and material, blocking progress until cleared.
Returns: Hold and release history recorded on the ticket
NCR / MRB Disposition Workflow
Problem: Non-conformance reports and MRB decisions are tracked in email and spreadsheets.
How it works: Structured NCR creation, disposition routing, and sign-off tied to the held ticket or lot.
Returns: Dispositions and scrap/rework outcomes returned to MRP
Gauge & Calibration Tracking
Problem: Calibration due dates live in a spreadsheet someone has to remember.
How it works: Gauge registry with due-date alerts and use-blocking for out-of-calibration tools.
Returns: Calibration history for audits
Work Instructions & Engineering Docs
Problem: Operators ask around to find out which print or instruction revision is current.
How it works: Revision-controlled instructions and engineering docs are shown inside the active job view.
Returns: Record of which revision was displayed during production
ECO Change Routing & Floor Acknowledgement
Problem: Engineering changes reach the floor late or without confirmation.
How it works: ECOs route to affected stations with required operator acknowledgement.
Returns: Acknowledgement trail per revision
Barcoding & Inventory Moves
Problem: Inventory counts drift because moves are written down and keyed in later.
How it works: Custom labels and scan-based transfers for bins, lots, and WIP.
Returns: Inventory movements synced to the MRP
Ticket Traveler Cards with Live Inventory Availability
Problem: Jobs start before anyone confirms painted parts or shelf parts are ready.
How it works: Each traveler card shows whether required inventory—like painted parts or shelf parts—is available before work begins.
Returns: Material readiness visible on every ticket
Kitting / Material Staging
Problem: Kits are pulled incomplete and discovered short at the station.
How it works: Scan-verified kit building against the job BOM before release.
Returns: Kit completion and shortages reported
Tool Crib Checkout
Problem: Tooling goes missing with no record of who has it.
How it works: Badge and barcode checkout/return tracking for tools.
Returns: Tool usage and location history
Shipping & Pack Verification
Problem: Wrong parts or quantities leave the dock.
How it works: Scan-verified packing against the sales order before shipment.
Returns: Verified shipments posted for invoicing
Floor Ticketing for Maintenance, Tooling & IT
Problem: Machine issues and tooling requests are reported verbally and forgotten.
How it works: Floor staff open tickets that route, escalate, and track to resolution.
Returns: Time-stamped issue and resolution history
Preventive Maintenance Schedules
Problem: PMs slip because schedules live on a whiteboard.
How it works: Recurring PM tasks auto-generate tickets per asset.
Returns: PM completion history per machine
Station Labor Capture to Payroll Export
Problem: Supervisors re-key shift and job hours into payroll.
How it works: Ticket time and badge scans are compiled into a payroll-ready export.
Returns: Verified hours delivered to payroll
Agentic RFQ / Quote Assistant
Problem: Estimators dig through past jobs manually to build each quote.
How it works: An AI assistant parses RFQs and surfaces comparable historical jobs for human review.
Returns: Draft quotes for estimator approval
Agentic PO Follow-up
Problem: Buyers chase late vendor deliveries by hand.
How it works: An agent monitors open POs, flags lead-time risk, and drafts vendor follow-ups.
Returns: Vendor status notes for buyer approval
Cert / Packing-Slip Extraction
Problem: Material certs and packing slips are typed in manually.
How it works: Document extraction pulls key fields for human verification.
Returns: Verified cert data attached to receipts
CMMC Role-Scoped CUI Document Access
Problem: Controlled prints sit on open shares and shared kiosks.
How it works: Role-based access and audit logging for controlled documents at each station.
Returns: Access logs for assessment evidence
ISO 9001 Audit Documentation From the Live System
Problem: Audit prep means scrambling to assemble records and describe processes from memory.
How it works: Audit documentation is built from how the floor system actually controls documents, inspections, holds, and traceability.
Returns: Audit-ready documentation grounded in real floor records
Executive Dashboards
Problem: Leadership waits on manual spreadsheets to know what's in progress, on hold, or short.
How it works: Live dashboards built from floor records show WIP and job status by department, quality holds, inspections and scrap, and alert activity.
Returns: Real-time operating picture for owners and plant managers
Shipping Dashboard
Problem: Nobody sees late shipments until a customer calls.
How it works: A shipping view shows what's due, what's shipped, and what's late, built from job and ticket status.
Returns: Shipping status visible to leadership and the dock
Inventory & Parts Availability Visuals
Problem: Shortages are discovered at the station instead of ahead of time.
How it works: KPI visuals show parts and material availability across open jobs, using barcoded inventory and traveler card status.
Returns: Availability visible before work is released
Downtime Reason Codes & OEE
Problem: Downtime is invisible or explained after the fact from memory.
How it works: Operators tap a downtime reason on their ticket and, paired with camera-based run/idle detection, availability and OEE roll up by machine and shift.
Returns: Downtime Pareto and OEE trends by asset
Camera-Based Machine Utilization (No Sensors)
Problem: Nobody knows how much a machine actually runs, and retrofitting sensors on older equipment is costly.
How it works: An existing CCTV camera watches a turret press and detects when it is moving or idle, building a time utilization report without installing sensors on the machine.
Returns: Run vs. idle time utilization report per machine
Cost of Quality Tracking
Problem: Scrap, rework, and holds are counted but never priced.
How it works: Holds, scrap, and rework dispositions are valued using MRP standard costs and labor time.
Returns: Dollar impact of quality issues by part, cell, and cause
Actual vs. Estimated Job Cost
Problem: Quotes are based on guesses because actual hours never get compared.
How it works: Ticket time tracking is compared to quoted hours per operation, and the history feeds future quoting.
Returns: Job margin visibility and better quote inputs
Supplier Scorecards
Problem: Vendor performance is judged by gut feel.
How it works: RIL inspection results and PO delivery dates roll up into on-time and quality scores per supplier.
Returns: Supplier quality and delivery history
Automated Daily Reports
Problem: Owners have to log in or ask around to know how yesterday went.
How it works: An end-of-shift or morning summary of shipping, holds, and alerts is emailed or texted automatically.
Returns: Scheduled operating summaries
Andon Floor Screens
Problem: Line status and open alerts are only visible on individual devices.
How it works: Wall-mounted displays show live line status and open alert badges for the whole floor.
Returns: Shared visual status across the floor
Visual Scheduling Board
Problem: Schedules live on whiteboards and get out of sync with the MRP.
How it works: A visual board shows the production schedule on screen, built from the same job records the floor works from.
Returns: One shared schedule for planners, leads, and the floor
Training & Skills Matrix
Problem: Nobody can prove who is trained on which revision.
How it works: Training sign-offs are tied to work instruction revisions, and jobs can be gated until the operator is qualified.
Returns: Competence records for ISO and customer audits
Corrective Action (CAPA / 8D)
Problem: Corrective actions are tracked in email and rarely closed out.
How it works: Structured root cause, containment, and effectiveness checks linked to the originating hold or NCR.
Returns: Closed-loop corrective action history
Lot / Heat Traceability Reports
Problem: Answering "where did this lot go?" takes days of digging.
How it works: Forward and backward genealogy reports trace material lots and heats through receiving, jobs, and shipments.
Returns: Recall-ready traceability in minutes
Cycle Counts & Min/Max Replenishment
Problem: Stockouts happen because reorder points live in someone's head.
How it works: Scan-based cycle counts and min/max or kanban triggers raise replenishment requests automatically.
Returns: Count adjustments and reorder signals
Certificates of Conformance & Shipping Docs
Problem: CoCs and packing lists are typed by hand at the dock.
How it works: Certificates, packing lists, and labels are generated from the job record and inspection results.
Returns: Shipment paperwork attached to each order
Customer Order Status Portal
Problem: Customer service fields constant "where's my order?" calls.
How it works: Customers log in to see order status, expected ship dates, and download certificates.
Returns: Fewer status calls, faster answers
Private AI Assistant Connected to Your ERP
Problem: Getting answers from plant data requires building a report first, and public AI chatbots can't be trusted with controlled data.
How it works: A chat assistant connected to the ERP and floor system runs on a local model on plant-controlled hardware, so questions and data stay inside your network and CMMC boundary.
Returns: Plain-English answers from your own data, without sending it to a public AI service
AI-Drafted Work Instructions
Problem: Writing work instructions takes engineering time nobody has.
How it works: Photos, video, or a walkthrough are turned into draft instructions for engineering review and approval.
Returns: Reviewed, revision-controlled instructions
Safety & 5S Audits
Problem: Audits and near-misses are recorded on paper and never trended.
How it works: Mobile checklists for 5S and safety audits plus near-miss reporting with follow-up tracking.
Returns: Audit scores and incident trends
Don't see your workflow?
If it lives on paper, a clipboard, or a spreadsheet today, we can map it.